Before
AfterAEE Palo Seco Industrial Tank Remediation & Coating
Contained lead-based coating removal, abrasive blasting, and certified industrial epoxy tank restoration.

Caguas Main Office
Carr 183 Km. 4.5, Bo. Tomas de Castro, Caguas, PR 00725
Operating Hours
Monday–Friday: 8:00 AM – 4:00 PM · Mercedita location only: Saturday 8:00 am – 12:00 pm · Sunday: closed
Industrial Case Studies
Before-and-after remediation, heavy structural demolition, and circular metal recycling outcomes.
Before
AfterContained lead-based coating removal, abrasive blasting, and certified industrial epoxy tank restoration.
Before
AfterControlled waterfront structural dismantling achieving over 90% ferrous scrap recovery and coastal environmental compliance.
Before
AfterHydraulic shearing, roll-off logistics, DACO-certified weighing, and audited landfill diversion certificates.
Before
AfterHEPA negative-pressure containment, third-party air clearance monitoring, and full EPA e-Manifest disposal.
Federal & Local Credentials
Every project is backed by active EPA, OSHA HAZWOPER, PR DRNA, and US DOT permits and disposal manifests.
U.S. Environmental Protection Agency
Occupational Safety and Health Administration
Departamento de Recursos Naturales y Ambientales
U.S. Department of Transportation
Trusted by Multinationals & Government Authorities




Rapid containment crews deployable across Puerto Rico in under 60 minutes. Direct coordination with EPA, USCG, and PR DRNA.