EPA NESHAP / OSHA 1926.1101Asbestos Abatement & Mitigation
Certified inspection, negative pressure containment, and safe abatement of asbestos-containing materials under EPA and OSHA standards.

Caguas Main Office
Carr 183 Km. 4.5, Bo. Tomas de Castro, Caguas, PR 00725
Operating Hours
Monday–Friday: 8:00 AM – 4:00 PM · Mercedita location only: Saturday 8:00 am – 12:00 pm · Sunday: closed
Our list of services is one of the most complete of its kind in the Caribbean market. We strive to improve the quality of the services that we provide, and aim to meet our customers' needs and expectations.
Rapid containment crews deployable across Puerto Rico in under 60 minutes. Direct coordination with EPA, USCG, and PR DRNA.
Full-Spectrum Contracting
Seven EPA, OSHA, and PR DRNA certified divisions engineered for industrial, commercial, and government facilities across Puerto Rico.
EPA NESHAP / OSHA 1926.1101Certified inspection, negative pressure containment, and safe abatement of asbestos-containing materials under EPA and OSHA standards.
EPA RRP / OSHA 1926.62Safe removal and encapsulation of lead-based paint in historic, commercial, and residential structures.
DOT 49 CFR / EPA RCRA Subtitle CDOT and EPA authorized logistics for handling, packing, and intermodal transport of hazardous waste streams.
OSHA 1926 Subpart TControlled dismantling of heavy industrial infrastructure, storage tanks, and petrochemical facilities.
IICRC S520 StandardComplete eradication of toxic fungal colonies and HVAC sanitization engineered for tropical climates.
PR DRNA Permit R-01-20 / ISRI StandardsFerrous and non-ferrous scrap processing with certified scale ticketing and global export logistics.
OSHA HAZWOPER 1910.120 / USCG Class BRapid deployment unit for containing and neutralizing chemical spills, hydrocarbon leaks, and environmental crises.
Why Choose Homeca Inc.
Homeca Inc. is a multi-disciplinary environmental, recycling and contracting firm serving Puerto Rico and the Caribbean. Our emergency response team and EPA-certified supervisors deliver turn-key remediation, demolition, and hazardous logistics with unmatched safety records.
Tailored abatement protocols for every facility.
Full EPA, OSHA HAZWOPER, and PR DRNA compliance.
24/7 island-wide Hazmat mobilization under 60 mins.


Federal & Local Credentials
Every project is backed by active EPA, OSHA HAZWOPER, PR DRNA, and US DOT permits and disposal manifests.
U.S. Environmental Protection Agency
Occupational Safety and Health Administration
Departamento de Recursos Naturales y Ambientales
U.S. Department of Transportation
Trusted by Multinationals & Government Authorities




Estimate preliminary mobilization, containment, and EPA disposal costs before requesting a formal site inspection.
Preliminary Budget Range
Includes certified crew mobilization, PPE/containment setup, and Puerto Rico regulatory compliance documentation. Final pricing subject to on-site inspection.